JRC Procedure for co-ordinating with wind energy developments

Changes with respect to the originally published version (1.0.0)

JRC Procedure for co-ordinating with wind energy developments
Version Information
Version Issue Date Changes Author Editor Authorised
1.0.0 15 JAN 2007 Initial Issue AAG SJP AAG
1.0.1 17 JAN 2007 Editorials: Para 14/15 Changed "small turbines" to "micro turbines" - small turbines, already defined in Calculation of the Clearance Zone, are larger than micro turbines and are therefore still subject to coordination. PAS SJP AAG

Return to Windfarms Home Page

Calculation of the Clearance Zone

Changes with respect to the originally published version (3.0.0)

Calculation of the Clearance Zone
Version Information
Version Issue Date Changes Author Editor Authorised
3.0.0 JUN 2006 Initial Issue PAS
3.0.1 30 OCT 2006 Clarification of low-frequency microwave link W/U and maximum link losses for UHF Telemetry.
Bibliography updated.
PAS SJP AAG
3.0.2 9 JAN 2007 Modification (relaxation) of the criteria for small turbines (of less than 100m2 swept area).
Minor amendments to clarify text and inclusion of Version Information Table.
PAS SJP AAG

Return to Windfarms Home Page


This site, its design and content are ©1994-2008 The Joint Radio Company Ltd.
Webmaster@jrc.co.uk | Page Last Modified: Wednesday March 07, 2007 | Print Date: Tuesday October 07, 2008
The Joint Radio Company Limited Registered Office: Dean Bradley House, 52 Horseferry Road, LONDON SW1P 2AF
Vat Reg. No.: GB 657 3193 17 Registered in England & Wales: 2990041

Valid CSS!