|
|
Joint Radio Company:
Making the spectrum work for your business
|
|
|
|
|
|
JRC Procedure for co-ordinating
with wind energy developments
Changes with respect to the originally published
version (1.0.0)
JRC Procedure for co-ordinating with wind
energy developments
Version Information
|
|
Version
|
Issue Date
|
Changes
|
Author
|
Editor
|
Authorised
|
|
1.0.0
|
15 JAN 2007
|
Initial Issue
|
AAG
|
SJP
|
AAG
|
|
1.0.1
|
17 JAN 2007
|
Editorials: Para 14/15 Changed "small turbines"
to "micro turbines" - small turbines, already
defined in Calculation of the
Clearance Zone, are larger than micro
turbines and are still subject to
coordination.
|
PAS
|
SJP
|
AAG
|
| 2.0 |
September 2009 |
Complete rewrite |
PAS |
PAS |
AAG |
| 2.0.1 |
October 2009 |
Applied modified rules for medium-sized turbines of >2m and <30m rotor diameter. |
PAS |
PAS |
AAG |
Calculation of the Clearance
Zone
Changes with respect to the originally published
version (3.0.0)
Calculation of the Clearance Zone
Version Information
|
|
Version
|
Issue Date
|
Changes
|
Author
|
Editor
|
Authorised
|
|
3.0.0
|
JUN 2006
|
Initial Issue
|
PAS
|
|
|
|
3.0.1
|
30 OCT 2006
|
Clarification of low-frequency microwave link
W/U and maximum link losses for UHF
Telemetry.
Bibliography updated.
|
PAS
|
SJP
|
AAG
|
|
3.0.2
|
9 JAN 2007
|
Modification (relaxation) of the criteria for
small turbines (of less than 100m2 swept
area).
Minor amendments to clarify text and inclusion
of Version Information Table.
|
PAS
|
SJP
|
AAG
|
| 3.1 |
September 2009 |
Major Revision |
PAS |
PAS |
AAG |
|
|
|
Joint Radio Company Limited
Dean Bradley House
52 Horseferry Road
LONDON SW1P 2AF
United Kingdom
+44 20 7706 5199
Contact Us
|
|
©2009 Joint
Radio Company Limited
|
|