JRC Procedure for co-ordinating with wind energy developments

Changes with respect to the originally published version (1.0.0)

JRC Procedure for co-ordinating with wind energy developments
Version Information
Version Issue Date Changes Author Editor Authorised
1.0.0 15 JAN 2007 Initial Issue AAG SJP AAG
1.0.1 17 JAN 2007 Editorials: Para 14/15 Changed "small turbines" to "micro turbines" - small turbines, already defined in Calculation of the Clearance Zone, are larger than micro turbines and are still subject to coordination. PAS SJP AAG
2.0 September 2009 Complete rewrite PAS PAS AAG
2.0.1 October 2009 Applied modified rules for medium-sized turbines of >2m and <30m rotor diameter. PAS PAS AAG

Calculation of the Clearance Zone

Changes with respect to the originally published version (3.0.0)

Calculation of the Clearance Zone
Version Information
Version Issue Date Changes Author Editor Authorised
3.0.0 JUN 2006 Initial Issue PAS
3.0.1 30 OCT 2006 Clarification of low-frequency microwave link W/U and maximum link losses for UHF Telemetry.
Bibliography updated.
PAS SJP AAG
3.0.2 9 JAN 2007 Modification (relaxation) of the criteria for small turbines (of less than 100m2 swept area).
Minor amendments to clarify text and inclusion of Version Information Table.
PAS SJP AAG
3.1 September 2009 Major Revision PAS PAS AAG